Wednesday, August 20, 2025

The Elephant Trunk Nebula with the Dwarf 3 telescope.

This is a slightly cropped image of the Elephant Trunk Nebula. Total integration was 3.1 hours. The image was stacked and stars were fixed in Stellar Studio. I then imported the FIT file into Siril, performed photometric calibration, removed the stars, stretched the image, and saved as a TIFF file. I tweaked the TIFF in Affinity 2 and saved as a PNG.

No comments:

Post a Comment

A 26 Hour Integration of M51 with the Seestar S 50

M 51 is a wonderful object for S50 imaging, and this image has a total integration time of just over 26 hours (20 second subs in EQ mode). I...